Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
Phase 1 will be split into 2 stages and our requirements are:
The appointment of Principle Designer to oversee, co-ordinate the design and implementation of the project, advising the Client on risks, and compliance to regulations. Support, prepare and administer - the BSA (Building Safety Act) submissions (2 Stage) to the regulator, including co-ordination of the comments/feedback, and validation.
Works scope Phase 1: Cleanroom Specialist Company to refurbish and / or design (if any needed) and qualify the existing St Thomas’ Lower Ground Floor Aseptic unit. The Aseptic Unit is to provide cytotoxic chemotherapy preparation for children and Adults. The Unit comprises 6 rooms of which includes: 2 change rooms (D and C Grades), 1 support room (D) and 2 manufacturing rooms (C Grade). New Isolators and may be gassing isolators are to be installed.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award 1 | Pollen Maddox | — | — |