Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
The Connecting the Culm (CtC) project is about working with nature and local communities, to help make the River Culm and its catchment better for wildlife and people, and more resilient to flood and drought. Connecting the Culm has been running for 8 years already and has a 25-year Blueprint for Delivery. There are a number of complimentary projects within the CtC programme, including work with Network Rail and through DRIP and Grant in Aid.
The two project implementation sites which form this tender submission are located at:
Each site consists of a series of nature based solutions, designed to tackle water quality failures from high risk outfalls off the M5 motorway. National Highways HEWRAT tool is being used to determine the scale and size of mitigation measures required.
The purpose of the project is to:
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | £144,000 |