Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
To install the following:
Bushbury Cemetery: 4 no double rows, each row being 40ft long consisting of 3 rows of edgings with gravel infill in new burial area.
Danescourt Cemetery: 1 no Single row, being 85ft long consisting of 2 rows of edgings with gravel infill on the Muslim Section
Danescourt Cemetery: 1 no Double row, being 175ft long consisting of 3 rows of edgings with gravel infill on Section S.
A site visit to view existing can be arranged.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award 1 | HILTON MAIN CONSTRUCTION LIMITED | — | — |