Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
Belmont Community Cinema Ltd (BCC) are seeking to appoint an Architect-led design team to provide services in connection with refurbishment works at the Belmont Cinema, Aberdeen. The appointed architect-led design team will work with the BCC team to refresh the interior design making it appealing, accessible and user-friendly to general visitor – plus any consequential alterations to existing plans.
| Lot | Title | Value |
|---|---|---|
| 1 | SCOPE OF SERVICES The architect-led design team will be made up of: - Architect: with cinema experience to provide Architectural, Lead Consultant and Lead Designer Services -- In addition, the architect or a member of the team must be an Accredited Conservation Architect, who will advise on conserving and enhancing the Heritage and produce a Heritage Impact Statement before mid-March 2027 – see Appendix H - Quantity Surveyor and/or cost consultant - Principal Designer [CDM Regulations] - PrincipSCOPE OF SERVICES The architect-led design team will be made up of: - Architect: with cinema experience to provide Architectural, Lead Consultant and Lead Designer Services -- In addition, the architect or a member of the team must be an Accredited Conservation Architect, who will advise on conserving and enhancing the Heritage and produce a Heritage Impact Statement before mid-March 2027 – see Appendix H - Quantity Surveyor and/or cost consultant - Principal Designer [CDM Regulations] - Principal Designer [Building Regulations] - Mechanical, Electrical & Plumbing Engineer with suitable cinema experience - Acoustic Engineer or Acoustician, primarily to input to cinema-specific elements of the design and build - Structural Engineer - Fire Engineer - If deemed necessary: -- an Acoustic Consultant or Environmental Health Officer to produce a noise impact assessment before mid-March 2027 -- Services and Sustainability Consultant | — |