Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
The installation of Rock bags (Salix Aqua Bags) along the face of the eroding bank upstream of the gauging station. The works are a temporary measure to hold the line until a long term solution is installed.
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award ocds-b5fd17-ce8ba6c1-a8bd-4309-8a9b-c1469857b8d8-1 | Bridge Civil Engineering Ltd | £142,875 | 8 Jul 2026 |