Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
Fire Compartmentation Works - Ivybridge Town Hall & The Watermark, Devon
You are invited to submit a tender for compartmentation and associated fire safety works at the project premises.
The works shall be undertaken in a live office environment, and contractors must plan accordingly to minimise disruption while maintaining safety and escape routes at all times.
Tender pricing shall be based on the information and drawings provided.
The successful contractor will be required to attend site to verify the estimated works prior to final commitment.
This section forms an integral part of the Invitation to Tender and sets out the specification.
2.1 General Compartmentation Works
2.2 Ground Floor Works
2.3 First Floor Works
o Fire-rated ceiling tiles
o Fire-rated suspended grid system
2.4 Fire Door Remedial Works (Town Hall & The Watermark)
o Intumescent strips
o Smoke seals
o Door closers
o Thresholds
o Adjustments to gaps
o Certification where applicable
2.5 Secondary Escape Stairway - Area 3
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
o Provide safe temporary protection
o Maintain minimum escape width
o Provide on-site management during works
o Coordinate phasing to ensure continuous compliance
Tenderers must provide separate point pricing for:
o Fire rated fire hood covers
o Appropriate fire sealing