Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
WYFRS requires the replacement of the workshop, garage and transport floor. The existing resin floor may need to be removed, or preparatory works may be required prior to the commencement of the project. The scope of works may also include the disposal of the existing floor.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Replacement of Transport Workshop Floor | ASPECT BUILDING SOLUTIONS LIMITED | — | 23 Jul 2026 |