Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
| Lot | Title | Value |
|---|---|---|
| 1 | The Mining Remediation Authority awarded a call-off contract under the Drilling and Grouting Framework (Lots 1, 2 and 3 - All Regions) for grouting works. The works comprise the design and delivery of mine entry treatment and associated drilling and grouting works to mitigate risks arising from historic coal mining activity. The contract was awarded to Soil Engineering Geoservices Ltd through the framework call-off procedure.The Mining Remediation Authority awarded a call-off contract under the Drilling and Grouting Framework (Lots 1, 2 and 3 - All Regions) for grouting works. The works comprise the design and delivery of mine entry treatment and associated drilling and grouting works to mitigate risks arising from historic coal mining activity. The contract was awarded to Soil Engineering Geoservices Ltd through the framework call-off procedure. | — |
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award 065573-2026-CA18/05485-1 | Soil Engineering Geoservices Ltd | — | — |