Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
This is a high-level construction advisory brief for BAM Nuttall Ltd to support programme development for the
Wylfa enabling works, specifically in relation to bulk earthworks and platform formation. The intention is to obtain practical, buildability-led input to inform early programme durations, sequencing strategies, and opportunities to
accelerate delivery.
The engagement shall remain deliberately high-level, non-prescriptive, and time-bound, using currently available
concept information. It is not intended to constitute detailed design or a formal instruction.
BAM shall provide advice on constructability, sequencing, and indicative durations for earthworks, considering
practical delivery constraints, material movements, and site handover requirements. The focus shall be on
identifying programme durations, key programme drivers, risks, and opportunities for optimisation, rather than
validating or developing detailed engineering outputs.
This requirement is being directly awarded to BAM due to:
All inputs/outputs will be made available to potential bidders for any future earthworks procurements.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award 1 | BAM NUTTALL LIMITED | — | — |