Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
The design, manufacture, supply, installation and commissioning of -
SGS Phase 5 Control Panel Replacement 2026/27
3 No. MCC dual pump Control Panels and 3 No. Single pump control
panels including associated works. Partial decommissioning of MCC
on one redundant borehole site.
(At the Client's sole discretion, SGS Phase 1 Control Panel
Replacement 2027/28 and SGS Phase 2 Control Panel Replacement
2028/29 below may be instructed via Compensation Event)
SGS Phase 1 Control Panel Replacement 2027/28
2 No. MCC dual pump Control Panels and 5 No. Single pump control
panels including associated works. Partial decommissioning of MCC
on one redundant borehole site.
SGS Phase 2 Control Panel Replacement 2028/29
1 No. MCC dual pump Control Panels and 8 No. Single pump control
panels including associated works.
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award ocds-b5fd17-27e4a85d-9a01-40dc-81a0-b9bc7347800d-1 | ECS Engineering Services Ltd | £732,289 | 11 Jun 2026 |