Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
The purpose of this commission is to appoint a Contractor under an early contractor involvement ("ECI") period, to carry out the detailed design of the remedial works identified within the Building Fabric Condition Survey Reports for the eight (8) ventilation stations across the Kingsway and Queensway Tunnel estate.
The proposed contract is a 2 (two) stage contract as detailed in the tender documents:
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | £15,000,000 |
Sign in to tag this notice and share notes on it with your team.