Swanage is a popular and thriving visitor destination, situated on the south coast adjacent to the Jurassic Coast World Heritage Site. The Green Seafront Ground Stabilisation and Enhancement Project is a transformational coastal regeneration and stabilisation scheme focused on protecting, enhancing and future-proofing a key section of the town's seafront, overlooking the beach.
The project includes:
The Contracting Authority is considering a Design & Build procurement model, under which the appointed contractor will be responsible for both the detailed design and construction of the works. A New Engineering Contract (NEC) Engineering and Construction Contract will be used.
The procurement model and contracting approach will be finalised following feedback captured during the Preliminary Market Engagement.
The scope is expected to include:
Anticipated procurement programme
At this stage, the Contracting Authority is working to the following programme:
These are indicative dates only and may be subject to change.
The construction programme assumes a 27-week construction programme (including a minimum of a 4-week landscape establishment period) as follows: