Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
The Contractors Framework is a vital part in the delivery of our Corporate Vision, particularly supporting maintaining and improving our assets as well as playing a part in inclusive regeneration and place making. The projects commissioned through our Framework are a tangible demonstration of the public value that Scottish Canals aims to deliver, as well as increasing the wider socio-economic sustainability of the local communities that the canals run through.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 – Civils including designLot 1 - Civils including design(including site set-up and primary emergency response) | — |
| 2 | Lot 2 – Landscaping including designLot 2 – Landscaping including design | — |
| 3 | Lot 3 – Hydrographic and Topographic Survey / Site Investigation / Ground InvestigationLot 3 – Hydrographic and Topographic Survey / Site Investigation / Ground Investigation | — |
| 4 | Lot 4 – MEICA including design - (Mechanical / Hydraulic / Electrical / Controls / Telemetry)Lot 4 – MEICA including design - (Mechanical / Hydraulic / Electrical / Controls / Telemetry) |
| — |
| 5 | Lot 5 – FabricationLot 5 – Fabrication | — |
| 6 | Lot 6 – DredgingLot 6 – Dredging | — |
| 7 | Lot 7 - Regional Construction WorksLot 7 - Regional Construction Works – This lot is split up into regional sub lots as below: Lot 7a – Lowlands Lot 7b – Caley Lot 7c - Crinan | — |
| 8 | Lot 8 - Professional Service - Engineering and Built EnvironmentLot 8 - Professional Service - Engineering and Built Environment (this lot is sub divided into lots 8a & 8b) Lot 8a - Professional Service - General (no Reservoirs) Lot 8b - Professional Service - Reservoirs | — |