Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
Galleries 2 and 3, sand and reseal floors. This work must be carried out from 17th August - 28th August 2026.
The works can be carried out either within or out with Normal Working Hours (0800 - 1700)
Operatives must have a basic Disclosure Scotland Certificate no older than 3 months from issue.
| Lot | Title | Value |
|---|---|---|
| 1 | Galleries 2 and 3, sand and reseal floors. This work must be carried out from 17th August - 28th August 2026. The works can be carried out either within or out with Normal Working Hours (0800 - 1700) Operatives must have a basic Disclosure Scotland Certificate no older than 3 months from issue.Galleries 2 and 3, sand and reseal floors. This work must be carried out from 17th August - 28th August 2026. The works can be carried out either within or out with Normal Working Hours (0800 - 1700) Operatives must have a basic Disclosure Scotland Certificate no older than 3 months from issue. | — |