Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
Seismic strengthening works to the British Ambassador's Residence in Athens have been completed successfully and all original heritage features have been reinstated. Investigations during these works identified the need for a full replacement of the building services installations, and additional scope has been introduced by the Client, including a new commercial kitchen and local audiovisual systems. The Stage 4 design is being finalised and will incorporate all of these requirements ahead of the ITT being issued.
The remaining scope comprises a major refurbishment of the residence, including repairs to internal walls, redecoration of internal rooms, bathroom and kitchen upgrades, installation of a new commercial kitchen, replacement of flooring throughout, full replacement of all MEP systems, fire safety improvements, installation of a new externally accessed lift, drainage works to separate foul and surface water systems, and roof replacement and solar PV install. All works will be undertaken with careful consideration of the heritage significance of the property.
The objective is to deliver a high-quality diplomatic residence that is modern, compliant and resilient while preserving the character and significance of the historic building.
The Contractor and any subcontractors utilised must demonstrate the capability and experience necessary to deliver the works in accordance with relevant UK standards and project-specific requirements to a high-quality finish.
Further information on experience of delivering complex refurbishment projects in heritage, diplomatic or similarly sensitive environments will be helpful in supporting our understanding of the relevant capabilities of suppliers interested in this opportunity.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |