Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
The proposed works comprise the construction of flood risk management infrastructure including new highway drainage systems, a cut-off drainage swale, replacement and enhancement of an existing highway culvert, construction of flood embankments and flood walls, installation of an additional culvert to relieve storm flow pressures on the existing network, and maintenance of existing drainage ditches with associated culvert improvements.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |