Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
NNC has a requirement for a comprehensive works design and build contract to undertake the full removal and replacement of the existing sports hall floor (594m2) to return the facility with a modern and compliant heated sports hall floor. The floor is constructed upon a concrete slab consisting of an insulated floating concrete screed, with an embedded hydronic underfloor heating system, vinyl floor finish and sports line markings
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |