Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
614752 A27 Falmer Footbridge Headroom for BAPA to carrying out cores for the full length of the slip
road on carriageway of which section of it is on top of Network Rail tunnel below the carriageway
surface followed by resurfacing and reinstatement at Middle Street, Falmer, Brighton, BN1 9PD.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award 1 | Network Rail | — | — |