Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
The following systems are to be supplied, installed, set to work, tested, commissioned, handed over and maintained for the 12 months Defects Liability Period:
| Lot | Title | Value |
|---|---|---|
| 1 | The following systems are to be supplied, installed, set to work, tested, commissioned, handed over and maintained for the 12 months Defects Liability Period: - Downtakings and Removals - Replacement of existing air handling unit and - associated ductwork, dampers, pipework and valves - Automatic controls installation - Thermal insulation - Associated general works - Builderswork in connection with services - Minor Electrical Works - Testing & Commissioning - Defects LiabilitThe following systems are to be supplied, installed, set to work, tested, commissioned, handed over and maintained for the 12 months Defects Liability Period: - Downtakings and Removals - Replacement of existing air handling unit and - associated ductwork, dampers, pipework and valves - Automatic controls installation - Thermal insulation - Associated general works - Builderswork in connection with services - Minor Electrical Works - Testing & Commissioning - Defects Liability Maintenance - Asbestos surveys and removals | — |