Barbican Renewal Programme - Glass Systems and Envelope
TenderHighlights
- Tender deadline
- —
- Estimated value
- £10,600,000
- Location
- UKI
Details
- Published
- 2 Oct 2026
- Tender deadline
- —
- Value
- £10,600,000
- Location
- UKI
- Source
- Find a Tender
- Source notice ID
- 093212-2026
- OCID
- ocds-h6vhtk-06fa74
- CPV codes
- 44211500, 45223210, 45300000
Description
Glass Systems and Envelope — Barbican Renewal Programme.
This is a bespoke glazed envelope design-and-build package, not new-build construction, on a part Grade II listed and Heritage sensitive building – The Barbican Arts Centre. The works comprise new glazed envelope and façade systems to the Conservatory and Stair 8, following directly behind the demolition (by others), which removes the existing glazing first. The package includes primary steel structure to the Conservatory and Terrace, and the façade access/maintenance walkway and associated gutters and louvres. The scope of works includes:
- Conservatory roof and vertical glazing: louvres, vents, perimeter benches, insulation, aluminum paneling, doors and associated gutters, including the Arid House.
- Steel structure relating to Conservatory glazing: primary steel structure supporting the Conservatory roof and vertical glazing systems, carried within this package's own Contractor Design Portion.
- Conservatory Lantern: re-glazed roof lantern.
- Conservatory Roof lights: Level 02 office roof lights and associated overhead glazing.
- Garden Room glazing, doors and associated gutters: refurbished steel framing to Lakeside Terrace with new acoustic double glazing/doorsets, overhead and Conservatory-facing glazing, and plant-room gutter louvre/infill system.
- Conservatory Terrace Glazing and Steel: new Level 04 enclosure — bespoke steel T-profile vertical glazing, matching overhead glazing, and the Terrace's primary steel structure and roof steelwork.
- Sculpture Court Roof lights: new roof lights, scope to be developed with the Architect and Façade Engineer.
- Stair 8 glazing and associated structure, louvres and gutters: crown/roof glazing on new external primary steel RHS mullions, planters glazing renewal, automated opening windows, exoskeleton mullion replacement (this package's own CDP), and crown mechanical louvres.
- Visual and performance mock-ups: façade and propagation bench, Conservatory Terrace and Fly tower infill glazing visual mock-ups, plus off-site performance mock-ups covering roof and façade weather-resistance to CWCT Sequence A methodology.
- Facade access and associated maintenance walkway: including the Conservatory Terrace mesh walkway and fascia panel.
Similar opportunities
- Malaysia Penang Centre Regear and RefitTenderBritish CouncilCloses 23 Oct 2026
- ITT - Swindon Archive Decarbonisation Design Team (UID 320)TenderHistoric England£149,000
- 4 John Street, Maryport - Lintel Replacement and RenderingTenderStorm Tempest LtdCloses 5 Nov 2026
- Onshore Wind Energy Development – NorthumberlandTenderForestry Commission£0
- Joinery Contractors FrameworkTenderNHS Lanarkshire—
More from The Mayor and Commonalty and Citizens of the City of London
View all- Termly school transport on the Ashtead Shuttle routeContractThe Mayor and Commonalty and Citizens of the City of LondonAwarded
- Marketing and branding leadContractThe Mayor and Commonalty and Citizens of the City of LondonAwarded
- Barbican Renewal Programme - LuminairesTenderThe Mayor and Commonalty and Citizens of the City of London£1,100,000
- Back Office Parking Management SystemAwardThe Mayor and Commonalty and Citizens of the City of LondonAwarded
- Third-Party Cyber Security Risk Management and Supply Chain Assurance PlatformContractThe Mayor and Commonalty and Citizens of the City of LondonAwarded
Lots (1)
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | £10,600,000 |