Barrier Safety Improvement Scheme
ContractHighlights
- Contract period
- —
- Supplier
- Beaver Bridges Limited
- Contract value
- —
Details
- Published
- 17 Aug 2026
- Deadline
- —
- Value
- —
- Location
- —
- Source
- Find a Tender
- Source notice ID
- 078045-2026
- OCID
- ocds-h6vhtk-068c1e
- CPV codes
- —
Description
The Authority is looking for suitably qualified contractor to undertake a design and build contract (NEC4 ECC) for safety improvement works on the Humber Bridge, comprising: Item 1 - Barrier Safety Improvement Scheme (BSIS): Design and installation of circa.5 km of footpath parapet height extension (east and west footpaths) across the suspension bridge, Barton South Approach Viaduct, and abutting anchorage sections. Item 2 - Footpath Expansion Joint Replacement: Design and replacement of 8 No. life-expired footpath expansion joints at Hessle and Barton Towers. The Contractor is responsible for permanent and temporary works design, and will assume Principal Designer and Principal Contractor duties under CDM 2015.
More from Humber Bridge Board
View all- Anchorage A-Frames Replacement SchemeAwardHumber Bridge BoardAwarded £5,999,851
- HBB Roller Shutter Joint (DEMAG) Inspection and MaintenanceContractHumber Bridge BoardAwarded
- Electrical Infrastructure Phase 2ContractHumber Bridge BoardAwarded
- Hanger Testing and Replacement SchemeContractHumber Bridge BoardAwarded
- Barrier Safety Improvement SchemeAwardHumber Bridge BoardAwarded £4,154,903
Lots (1)
| Lot | Title | Value |
|---|---|---|
| LOT-0000 | Lot LOT-0000 | — |
Awarded contracts (1)
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award 1 | Beaver Bridges Limited | — | — |