Hazlemere Parish Council are inviting companies to Tender for the refurbishment of Hazlemere Recreation Ground playground. The successful contractor will be responsible for the turnkey delivery of the project, including:
- Site Preparation: Safe dismantling, removal, and environmentally responsible disposal of all existing playground equipment and the current nature trail.
- Surfacing: Removal of existing safety surfacing and installation of a new, durable, compliant, and low-maintenance safety surface (e.g., wet pour, bonded mulch, or smart hybrid surfacing) that meets all BS EN 1176/1177 standards.
- Play Equipment Installation: Supply and installation of new play equipment catering to a wide range of ages and abilities.
- Nature Trail: Complete redesign and replacement of the nature trail to foster sensory and environmental engagement - it does not need to be another nature trail.
- (Optional) The Zip Wire: Replacement of the existing zip wire located adjacent to the main playground on a like-for-like basis (or enhanced equivalent), ensuring it remains a robust attraction for older children.
- Design & Play Requirements
Target Demographics
The playground must provide distinct yet beautifully integrated play zones that cater one primary age group, while maintaining overall inclusivity:
- Toddler & Junior (Ages 2-12 years): The core playground area must maximize play value, offering physical, sensory, social, and imaginative play opportunities.
- (Optional) Teens (Up to 16 years): The zip wire area must be designed to withstand heavy use and continue providing dynamic play value for older youth.
Key Design Principles
- Inclusivity: The design must look beyond minimum accessibility. We require a space where children with physical, neurodivergent, or sensory disabilities can play alongside their peers.
- Play Value: High density of play features per square meter (e.g., climbing, balancing, swinging, sliding, tactile panels, and roleplay elements).
- Biodiversity & Integration: The new nature trail should seamlessly blend into the recreation ground, utilizing natural materials where appropriate to encourage exploration of local flora and fauna.
- Value of money: The project must provide value for money
Budget & Financial Framework
- Core Proposed Budget: £80,000 (inclusive of all plant, labour, materials, waste disposal, and post-installation certification).