CA18222 - RTBC - SHGH - MPCE BED STORE
ExpiredHighlights
- Deadline
- 28 Aug 2026
- Estimated value
- £300,000
- Location
- —
Details
- Published
- 13 Jul 2026
- Deadline
- 28 Aug 2026
- Value
- £300,000
- Location
- —
- Source
- Contracts Finder
- Source notice ID
- 25d3885c-1fd9-41d6-bfd2-42bd0c1e3b73-905891
- OCID
- ocds-b5fd17-033b3275-4069-40e0-8c32-d14577ccfcad
- CPV codes
- 45000000
Description
The works comprise the phased refurbishment and reconfiguration of an existing area within St Helier Hospital to provide a new Bed Store and Medical Records Office. The successful contractor shall undertake all necessary architectural, mechanical, electrical and associated enabling works required to deliver a fully operational facility in accordance with current NHS Health Technical Memoranda (HTMs), Building Regulations and Trust standards.
The scope of works includes, but is not limited to:
Establishment of fully compliant infection prevention and control measures, including dust containment, temporary partitions, protection of adjacent hospital areas and phased working.
Internal strip-out and removal of redundant fixtures, fittings, doors, partitions and associated services.
Formation of new fire-rated partitions, alterations to existing openings and installation of new FD60 doorsets with associated ironmongery, glazing and access control modifications.
Alterations to internal layouts to accommodate the proposed Bed Store and Medical Records Office, including relocation of doors and sink positions where required.
Installation of new joinery, worktops, cupboards, shelving and associated fittings.
Mechanical alterations including domestic hot and cold water services, drainage modifications, insulation, relocation of sanitary fittings and associated builders' work.
Electrical alterations including strip-out of existing installations, complete rewiring where required, new containment, lighting, emergency lighting, small power, fire alarm modifications and associated testing and commissioning.
Medical gas modifications where identified within the contract documents, undertaken by competent specialists in accordance with HTM 02-01 requirements.
Builders' work associated with all mechanical and electrical installations, together with making good and reinstatement of all disturbed finishes.
Testing, commissioning, certification, provision of as-built documentation and handover of all systems upon completion.
All works shall be undertaken within a live acute hospital environment, maintaining safe operation of adjacent clinical services and complying with all Trust permit-to-work procedures, infection prevention requirements, NHS standards and statutory legislation.
To access this competition:
Registered:
Login to https://suppliers.multiquote.com and view the opportunity CA18222.
Not registered:
Visit https://suppliers.multiquote.com then register and quote CA18222 as the reason for registration.
Any queries please contact MultiQuote on 020 3920 8054.
Similar opportunities
- BCU-ITT-64088 - NORTH WALES MEDICAL SCHOOL - CENTRAL (YGC)TenderBetsi Cadwaladr University Health BoardCloses 15 Oct 2026
- Liversedge and Settle RoofTenderYorkshire Housing LimitedCloses 18 Sept 2026
- Forest Infrastructure Construction & Maintenance Framework 2027TenderNatural Resources WalesCloses 21 Oct 2026
- Relocation of Thorne Moors Viewing TowerTenderNatural EnglandCloses 15 Oct 2026
- Capital Works and Associated Services Dynamic Purchasing SystemTenderProcurement for Housing Limited—
More from Epsom & St Helier University Hospitals NHS Trust
View all- CA18455 - R9309 Ferguson House Emergency LightingTenderEpsom & St Helier University Hospitals NHS TrustCloses 21 Sept 2026
- Medical Revalidation SoftwareContractEpsom & St Helier University Hospitals NHS TrustAwarded
- CA18353 - R9321 - SHGH - Roof Works 2ExpiredEpsom & St Helier University Hospitals NHS TrustClosed 2 Sept 2026
- CA18340 - R9309 - SHGH - A-Lower Board ReplacementExpiredEpsom & St Helier University Hospitals NHS TrustClosed 4 Sept 2026
- CA18285 - R9367 - SHGH - CT REPLACEMENT - BRPD ARCHITECTURAL SERVICESExpiredEpsom & St Helier University Hospitals NHS TrustClosed 21 Aug 2026