Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
This Invitation to Tender (ITT) relates to the supply of Electric Vehicle Charging Infrastructure, Chargepoints and Associated Services
Lot 1 oversees standard (7kW AC charging) and fast (22kW AC or DC charging) chargepoint sockets and all four (4) commissioning bodies require the provision of these chargepoint sockets.
Lot 2 oversees rapid (49kW AC or 50 kW DC) chargepoint sockets. Only Lincolnshire County Council and Stoke on Trent City Council require the provision of rapid charegepoint sockets.
Lincolnshire County Council is leading on this procurement process on behalf of the Third Midlands Electric Vehicle Infrastructure Consortium (TMeviC)
The Consortium consists of the following Local Authorities:
The TMeviC is a joint Project between Midlands Connect (Regional Sub-National Transport Authority) and the Local Authorities that make up the Consortium. The Project aims to provide local residential charging infrastructure, through the expansion of the number of Electric Vehicle Chargepoints (EVCPs) in areas with high dependence of on-street parking.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
| 2 | Lot 2 | — |
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Lot 1 Standard 7-22kW | CHAR.GY LIMITED | — | 21 Jul 2026 |
| Award 2 | EZO Charging Limited | — | 21 Jul 2026 |