Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
Objectives
The objective of the project is to on behalf of the Environment Agency (the Contracting Authority) complete an optioneering study for each of the three sites to identify the preferred option for eel passage. This should then be progressed to detailed design suitable for construction. The eel pass design at each site should deliver the following objectives:
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award ocds-b5fd17-e3fd6297-f3a2-44eb-8704-80b005a86c9d-1 | Fishtek Consulting | £57,286 | 15 Jul 2026 |