Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
Desilting of Harrington Drain west of Wilsthorpe Road (36m) and culverts (18m) under Wilsthorpe Road to improve conveyancing.
Desilting of Golden Brook at Far Croft to remove gravels upstream and downstream to improve conveyancing.
Desilting of Repton Brook at Brook End (silted under and
upstream of Brook End bridge), Askew Grove (silted upstream and downstream of Askew Grove bridge) and Pinfold Lane (silted upstream and downstream of Pinfold Lane bridge) to improve conveyancing.
Desilting of Hemington Brook (north of Hemington Primary School) to remove silt and weeds and improve conveyancing.
Desilting of Hemington Brook (off Church Lanel) to remove silt to improve conveyancing.
Desilting of Lockington Brook adjacent to Main Street to improve conveyancing.
Desilting at Hogshaw Brook (confluence of Hogshaw Brook and River Wye off Bakewell and Fairfield Road and northwest of Fairfield Road bridge), to remove debris build up to improve conveyancing.
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award ocds-b5fd17-f677eef8-13c2-484c-a149-780b2ef2d264-1 | Jackson Civil Engineering Limited | £232,907 | 11 Jun 2026 |