Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
UKAEA requires the supply of a Getter Bed Regeneration System for the Tritium Management System located in the new Lithium Breeding Tritium Innovation (LIBRTI) Facility at Culham Campus. The Getter Bed Regeneration System will provide a fully integrated turnkey Getter Bed impurity treatment solution. This will require the contractor to design, manufacture, install, test, and assist with commissioning of the system.
| Lot | Title | Value |
|---|---|---|
| LOT-0000 | Lot LOT-0000 | — |