Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
EKFB seek EOI's from interested parties with the appropriate experience and resources for the supply of 8 wheel tipper wagons to support the delivery of our C23 HS2 project. The 3 areas for delivery are North Chilterns to Aylesbury (NC2A), Calvert to Greatworth (C2G) and Greatworth to Southam (G2S).
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.
EKFB may look to award multiple Suppliers to suit geographical capability dependant on the response to this EOI, in support of SME's and Local Businesses.