Delivery, Management and Maintenance of Public & Private EV Infrastructure
TenderHighlights
- Tender deadline
- 26 Oct 2026
- Estimated value
- —
- Location
- UKC
Details
- Published
- 9 Oct 2026
- Tender deadline
- 26 Oct 2026
- Value
- —
- Location
- UKC
- Source
- Find a Tender
- Source notice ID
- 095727-2026
- OCID
- ocds-h6vhtk-068a0a
- CPV codes
- 31158000, 31600000, 45310000, 50000000, 51100000, 71314000
Description
Places for People and Anchor (collectively, the Employer) is jointly procuring a single supplier to provide a scalable, end-to-end electric vehicle charging infrastructure solution across the Places for People and Anchor property portfolios. The requirements include the supply and installation of charging hardware, retrofit works, commissioning, software and back-office management, payment systems, customer support, monitoring, servicing, maintenance, testing and the adoption or replacement of existing charge points.
The programme anticipates the delivery and management of approximately 20,000 charge points over an initial contract term of ten (10) years, with an option to extend for a further five (5) years. The estimated total contract value is £39.2 million. The commercial model will be fully client-funded, with the infrastructure owned by the relevant contracting organisation.
Services will be provided across new-build, retrofit and residential locations and will include site assessment, design, supply-only requirements, installation, mobilisation, stakeholder engagement, project management, monitoring, reporting and ongoing asset-performance management. Requirements will be instructed on a site-by-site basis using the successful supplier's contracted Schedule of Rates. No minimum volume, value, site allocation or level of work is guaranteed.
Participants are required to submit one tender covering both Lots. The same supplier will be appointed to both Lots, with separate contracts entered into by Places for People and Anchor which will be managed separately.
Similar opportunities
- Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in EnglandTenderNatural EnglandCloses 26 Oct 2026
- ITT - Swindon Archive Decarbonisation Design Team (UID 320)TenderHistoric England£149,000
- 4 John Street, Maryport - Lintel Replacement and RenderingTenderStorm Tempest LtdCloses 5 Nov 2026
- HVPS CablingTenderUK Atomic Energy AuthorityCloses 5 Nov 2026
- Poplar Harca Lift Service and Maintenance – All EstatesTenderPoplar HARCA (Housing and Regeneration Community Association)Closes 6 Nov 2026
More from Places for People Group Ltd
View all- Property WorksAwardPlaces for People Group LtdAwarded
- Strategic Asset Management ServicesContractPlaces for People Group LtdAwarded
- Places for People Group InsuranceTenderPlaces for People Group LtdCloses 30 Oct 2026
- Places for People Group InsurancePlanningPlaces for People Group Ltd—
- Places for People (PfP) Kitchen Multi Lot Framework (Supply Only & Supply/Fit & Appliances) England & ScotlandPlanningPlaces for People Group Ltd—
Lots (2)
| Lot | Title | Value |
|---|---|---|
| 1 | Places for People (PfP)This Lot covers the provision of a fully managed electric vehicle charging infrastructure solution across the Places for People Group portfolio. The scope includes the design, supply, installation, commissioning, operation, maintenance, monitoring and lifecycle management of electric vehicle charge points, together with associated software platforms, payment processing, customer support and reporting services. The delivery model is intended to provide a long-term partnership with full lifecycle management of EV charging infrastructure. Based on current forecasts, the Employer anticipates approximately 20,000 charge points over the initial ten-year period, comprising approximately 19,500 driveway charge points and 500 retrofit charge points. These volumes are indicative only and are provided solely to assist bidders in understanding the potential scale of the opportunity. No minimum or guaranteed volume of work is offered, and actual requirements may be higher or lower than the figures stated. The Employer reserves the right to vary the rollout profile, timing, locations and volumes throughout the contract term in accordance with operational requirements, funding availability and asset strategies. | — |
| 2 | Anchor Hanover GroupThis Lot covers the provision of a fully managed electric vehicle charging infrastructure solution across Anchor's property portfolio. The scope includes the design, supply, installation, commissioning, operation, maintenance, monitoring and lifecycle management of electric vehicle charge points, together with associated software platforms, payment processing, customer support and reporting services. The delivery model is intended to provide a long-term partnership with full lifecycle management of EV charging infrastructure. Based on current forecasts, the Employer anticipates approximately 4,000 charge points over the initial ten-year period, comprising approximately 2,000 driveway charge points and 2,000 retrofit charge points. These volumes are indicative only and are provided solely to assist bidders in understanding the potential scale of the opportunity. No minimum or guaranteed volume of work is offered, and actual requirements may be higher or lower than the figures stated. The Employer reserves the right to vary the rollout profile, timing, locations and volumes throughout the contract term in accordance with operational requirements, funding availability and asset strategies. | — |