Design for Longevity- Electrolyser Prototype Design
AwardHighlights
- Award value
- £120,000
- Winning supplier
- AqSorption Limited
- Award date
- 14 Sept 2026
Details
- Published
- 15 Sept 2026
- Deadline
- —
- Value
- £120,000
- Location
- —
- Source
- Find a Tender
- Source notice ID
- 087220-2026
- OCID
- ocds-h6vhtk-06cdb2
- CPV codes
- —
Description
The STEP Fuel Cycle is the subsystem responsible for recovering, purifying and supplying tritium to the STEP fusion reactor. Tritium is present in a variety of forms, phases and compositions, including tritiated water. Vapour-phase electrolysis techniques such as solid-oxide electrolysis have been identified as a suitable technique for processing small quantities of tritiated water. The scope is to deliver the conceptual design of an electrolyser system (electrochemical cell or stack). This includes, but is not limited to, components of the electrolyser: electrolytes, electrodes, interconnects, separators, electrical connections, vessels, structural components, seals, gaskets, heating elements, inlet/outlet pipes, ports, flanges and instrumentation. The scope does not include conceptual design of ‘Balance of Plant’ equipment such as power supplies, pumps, purification stages, boilers, compressors or dehumidifiers. However, the impact on balance of plant equipment must be considered in design decisions for the electrolyser itself.
The scope is structured into three sequential phases with interim milestones. These phases will progressively develop technical understanding, validate assumptions, and converge on agreed technical content.
More from UK Fusion Energy Limited
View all- STEP Engineering System Partners ProcurementTenderUK Fusion Energy LimitedCloses 29 Jan 2027
- Moveable Shielding Concept Design StudyContractUK Fusion Energy LimitedAwarded
- Palladium Silver Membranes Tensile and Fatigue TestingAwardUK Fusion Energy LimitedAwarded £143,500
- Corrosion Testing Framework for STEPAwardUK Fusion Energy LimitedAwarded £6,000,000
- Cryogenics Partner for the STEP ProgrammePlanningUK Fusion Energy Limited£0
Lots (1)
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
Awarded contracts (1)
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Design for Longevity- Electrolyser Prototype Design | AqSorption Limited | £120,000 | 14 Sept 2026 |