DfI TRAM Road Asset Management – Road Restraint Systems Framework

Expired

DfI Transport and Road Asset Management (TRAM)

Highlights

Deadline
9 Jul 2026
Estimated value
£22,000,000
Location
UKN

Details

Published
26 Jun 2026
Deadline
9 Jul 2026
Value
£22,000,000
Location
UKN
Source
Find a Tender
Source notice ID
060248-2026
OCID
ocds-h6vhtk-0696cd
CPV codes
45000000, 45200000, 45220000, 45221000, 45223000, 45230000, 45233280
View on Find a Tender

Description

This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023.

RAM Road Restraint Systems Framework will include the following work activities:

A. Road restraint systems installation and/or repair (standalone RRS including maintenance, renewals and new installations);

B. Full or partial demolition of structures associated with road restraint systems;

C. Earthworks

D. Brickwork, blockwork and stonework

E. Structural concrete construction and/or repairs associated with road restraint systems;

F. Inspection assistance

G. Temporary Traffic Management (TTM) on a live trafficked public road network

H. Associated ancillary Works

Further ancillary works may be asked of the successful Supplier such as:

  • Surface reinstatement
  • Site clearance including vegetation removal

The Framework will comprise of three area Lots (Work Orders valued up to £750k exc VAT). A Project Lot will be used to deliver individual NEC ECC projects covering all the geographical areas detailed below (valued between £750,001 and £5m exc VAT

Area Lots;

  • RRSF N1 – Causeway Coast & Glens, Mid & East Antrim and Antrim & Newtownabbey;
  • RRSF E&S1 – Belfast, Lisburn & Castlereagh, Armagh, Banbridge & Craigavon, Newry, Mourne & Down and Ards & North Down;
  • RRSF W1 – Mid Ulster, Derry & Strabane and Fermanagh & Omagh.

This Framework will deliver works from Call-Off contracts with an overall cumulative value of £22m (ex VAT) over the four-year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £27.5m (ex VAT).

Similar opportunities

More from DfI Transport and Road Asset Management (TRAM)

View all

Lots (4)

LotTitleValue
1RRSF P1 (Projects Lot)Lot for NEC4 Call-Off Contracts awarded following a mini-competition process for Work Packages valued over £750,001 up to £5m covering all Framework contract areas.£4,000,000
2RRSF N1 (Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim)ICC Measured Term Contract for structures works within the Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £6.2m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £7.75m (ex VAT).£7,750,000
3RRSF E&S1 (Belfast; Lisburn and Castlereagh; Ards and North Down, Newry, Mourne and Down and Armagh, Banbridge and Craigavon)ICC Measured Term Contract for structures works within the Belfast; Lisburn and Castlereagh; Ards and North Down, Newry Mourne and Down and Armagh, Banbridge and Craigavon contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £6m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £7.5m (ex VAT).£7,500,000
4RRSF W1 (Derry and Strabane; Fermanagh & Omagh; Mid-Ulster)Measured Term Contract for Structures works within the Derry and Strabane; Fermanagh & Omagh; Mid-Ulster contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £5.8m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £7.25m (ex VAT).£7,250,000
DfI TRAM Road Asset Management – Road Restraint Systems Framework | Winston Scout