Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
Construction of 258m3 attenuation basin as per designs
Construction of new manhole off Yorkshire Water sewer with weir allowing water into basin as per design
Construction of Headwall as per design
Removal of Waste material as required.
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award ocds-b5fd17-3c59e199-2473-4471-a9cc-2db53ce21714-1 | Tekton Civil Engineering | £109,000 | 18 Jun 2026 |