East Cambridgeshire District Council (ECDC) invites quotations to carry out refurbishment works at the Cloisters public toilets, The Cloisters, Ely, CB7 4ZH.
Main Works (Male Toilets)
- Remove toilet roll holders
- Remove laminated cubicles
- Remove IPS panels
- Remove vanity unit
- Remove toilets, hand basins and taps
- Clean down ceilings, fill and paint
- Paint 2 No doors, liners and architraves
- Install new IPSs and vanity unit (CGL) compact grade laminate
- Install 2 No cubicle doors and side panels (CGL)
- Supply and fit 2 No new toilets and seats
- Install wiring for heaters
- Install 2 No basins and wastes
- Install 2 No hot water taps and water heaters
- Install toilet roll holders
- Mastic seal to worktop / tiles
- Dispose of all debris
Main Works (Female Toilets)
- Remove toilet roll holders
- Remove laminated cubicles
- Remove IPS panels
- Remove vanity unit
- Remove toilets, hand basins and taps
- Clean down ceilings, fill and paint
- Paint 2 No doors, liners and architraves
- Install new IPS's and vanity unit (CGL) compact grade laminate
- Install 4 No cubicle doors and side panels (CGL)
- Supply and fit 4 No new toilets and seats
- Install conduit and wiring for heaters
- Install 4 No basins and wastes
- Install 4 No hot water taps and water heaters
- Install toilet roll holders
- Mastic seal to worktop / tiles
- Dispose of all debris
Service Area / Cupboard
- Remove redundant waste cylinder
- Remove redundant pipework and wiring
- Supply and install 1 No wall hung water heater
- Connect existing pipework to the new water heater to 2 No sinks
- Clean down the ceiling, fill and paint
- Paint 2 No doors, liners and architraves
- Patch over missing tiles
Disabled Toilet
- Remove existing tap
- Remove hot feed pipe feeds
- Supply and install a water heater to the service cupboard, including all wiring
- Install 1 No hot water sensor tap to the existing basin