Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
EKFB JV seek EOI's from interested parties with the appropriate experience and resources for the supply of Welfare Equipment (inclusive of Mobile Welfare Accommodation, Welfare Vans, Portable Toilets) to support the delivery of our C23 HS2 project. The 3 areas for delivery are North Chilterns Area and Aylesbury Area (NC2A), Calvert to Greatworth (C2G) and Greatworth to Southam (G2S).
EKFB JV is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.
EKFB JV may look to award multiple agreements to suit geographical capability dependent on the response to this EOI, in support of SME's and Local Businesses.
Sign in to tag this notice and share notes on it with your team.