Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
The improvement project includes two elements which may be let separately.
Firstly, installation of a hard surfaced footpath (preferred material, self-binding gravel finish) through the recreation ground - a distance of approx 750m with an average width of 1.5m.
Secondly, the extension of a concrete skatepark.
An outline brief has been prepared to assist interested parties.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |