EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
ExpiredHighlights
- Deadline
- 30 Jun 2026
- Estimated value
- £500,000
- Location
- South East
Details
- Published
- 23 Jun 2026
- Deadline
- 30 Jun 2026
- Value
- £500,000
- Location
- South East
- Source
- Contracts Finder
- Source notice ID
- 183433b7-20fc-4d4b-827c-d1e515bf47bf-903202
- OCID
- ocds-b5fd17-10bcec0d-425d-4f34-8f00-c2486ed03536
- CPV codes
- 44114200
Description
NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture.
We are seeking a specialist subcontractor to undertake the following works within the NC2A section:
The Subcontract Works include the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely and correctly complete the installation and handover of Precast Concrete UTX (Under Track Crossing) chamber system and adjoining ducts , as described in the specifications, drawings, HS2 standards Requirements and local authority specifications.
The UTX system comprises segmented precast concrete chambers with precast concrete covers, seated on a precast concrete base. The precast chambers and covers shall be supplied and delivered to site by the Contractor for installation by the Subcontractor. Contractor will Undertake excavation works to the UTX duct formation level, subcontractor will complete excavation for installation of UTX Chambers and ducts.
The Subcontract works include, but are not limited to:
Dewatering of excavations as required.
Provision of edge protection to ensure that excavation is safe for works
Protection of all existing assets
Setting out the UTX in accordance with the design and specifications, using primary control points provided by the Contractor.
Transfer UTX Chambers from Laydown Area to point of installation
Installation of the UTX system comprising segmented precast concrete chambers using methodology provided in detailed design
Install all units onto the precast concrete base slabs provided by the Contractor.
Install the full precast assembly, including the Precast concrete chamber segments and Precast concrete covers
Install all components in accordance with the approved drawings, specified line and level, and manufacturer's instructions.
Supply and install all associated ducting, ensuring compliance with project specifications and drawings.
As part of installation, CBGM / Cast in situ concrete - minimum FND4 concrete around UTX and ducts to be done by Subcontractor
Testing and handover
Similar opportunities
- Inner Moray Firth Housing & Property Maintenance Framework - 2026TenderHighland CouncilCloses 28 Sept 2026
- Nat - Supply of Temporary Flood Barriers - Open MarketTenderEnvironment AgencyCloses 25 Sept 2026
- T162 - Supply, Maintenance and Support Services of Blackline Safety Gas Detection Monitors and Draeger Breathing ApparatusTenderNORTHERN IRELAND WATER LIMITED£2,000,000
- Roofing Maintenance and repairsTenderUniversity of DundeeCloses 30 Sept 2026
- Supply and Delivery of Road Maintenance Supply ProductsTenderDepartment for InfrastructureCloses 21 Sept 2026
More from Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
View all- EKFB JV - Waste Management ServicesTenderEiffage Kier JV HS2 Main Civils Works, Lots C2 & C3Closes 9 Sept 2026
- EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - OpportunityExpiredEiffage Kier JV HS2 Main Civils Works, Lots C2 & C3Closed 12 Aug 2026
- EKFB JV - Daywork Hire of 8 Wheel Tipper Wagons - OpportunityExpiredEiffage Kier JV HS2 Main Civils Works, Lots C2 & C3Closed 31 Jul 2026
- EKFB JV - NC2A Footway and Accommodation Overbridges FRC worksExpiredEiffage Kier JV HS2 Main Civils Works, Lots C2 & C3Closed 17 Jun 2026