EV Charging Infrastructure
PlanningHighlights
- Deadline
- —
- Estimated value
- —
- Location
- UKC
Details
- Published
- 20 Jul 2026
- Deadline
- —
- Value
- —
- Location
- UKC
- Source
- Find a Tender
- Source notice ID
- 068388-2026
- OCID
- ocds-h6vhtk-06cf26
- CPV codes
- 31158000, 48000000, 51100000
Description
National Grid has a requirement for an effective, compliant and maintainable EV charging infrastructure that covers supply, design participation, installation, commissioning, warranty, on‑site support and ongoing maintenance, together with a dedicated back‑office delivery system to manage connectivity, payments, user support and MI/reporting.
The solution must enable safe, reliable and auditable charging for National Grid vehicles and users across a range of site types (substations and offices) and support efficient operational handover between installation and back‑office teams.
Similar opportunities
- Enterprise Geospatial Licensed Maps & DataTenderNATIONAL GRID UK LIMITED£0
- Automatic Fire Detection and Associated Equipment Installation, Maintenance and Reactive Repair at Windsor and London EstatesTenderThe Royal HouseholdCloses 2 Oct 2026
- The Provision of a Design, De-modification & Installation Service for Communication Equipment in Police Rotary and Fixed Wing AircraftTenderWest Yorkshire Combined AuthorityCloses 21 Oct 2026
- Communication and Connectivity Products and Services FrameworkTenderCrescent Purchasing Consortium LimitedCloses 4 Sept 2026
- Non-Torque Loading System for Electrical Machine Testing Including Drive SystemTenderUniversity Of EdinburghCloses 28 Sept 2026
More from NATIONAL GRID UK LIMITED
View all- Enterprise Geospatial Licensed Maps & DataTenderNATIONAL GRID UK LIMITED£0
- Offsite biodiversity gains and climate contributionsAwardNATIONAL GRID UK LIMITEDAwarded
- Excavation, Cable Laying and Reinstatement for Isles of ScillyTenderNATIONAL GRID UK LIMITEDCloses 25 Sept 2026
- Asbestos Consultancy and Removal FrameworkTenderNATIONAL GRID UK LIMITED£20,000,000
- Tender for the Framework for Traffic Management for ED & ETPlanningNATIONAL GRID UK LIMITED—
Lots (3)
| Lot | Title | Value |
|---|---|---|
| 1 | Civils, installation and supply of AC & DC chargersCivils, installation and supply of AC & DC chargers Participate in the design for each site Supply all hardware, cable and switchgear associated with the installations Appoint a panel of subcontractors Install the charge points, cabling and switchgear Commissioning: powerup and test the chargepoints Provide warranties on the hardware and installation Hand over the charge points to the Lot 3 provider for onboarding to a private cloud Provide on-site support | — |
| 2 | Mobile DC ChargersThe supply of Mobile DC chargers | — |
| 3 | System operating platform and annual / reactive maintenanceSystem operating platform and annual / reactive maintenance Back office support: Create a dedicated instance of the delivery system in a private cloud Install connectivity (SIM) Commission chargers Provide day to day remote support to users and charge points Provide RFID cards if required Collect payments for charging and return monies to National Grid Ensure that where onsite support is required, an engineer is deployed Provide MI to National Grid to enable measurement of KPIs and SLAs Provide on site support and maintenance | — |