Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
Kier Infrastructure are looking to engage with experienced and qualified contractors for the Bored Piling package for Highgill North and South Portal Structures on the M6 Lune Gorge Scheme.
The package is inclusive of, but not limited to, the supply and installation of all permanent and temporary works for the delivery of 48no. permanent and 2no. temporary 1050mm dia., 12.1m long bored piles along the B6257 which resides beneath the M6 Carriageway.
Main constraints to consider are: working headroom ranging from 6-10m, working platform on 1:10 gradient, proximity to Network Rail asset, working adjacent to a live B-road.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email infrastructure.procurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.