Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
TfL is the end client for the Temporary Tunnel Gauges and Temporary Platform works at Ruislip Depot. The Supplier/Contractor will act as Principal Contractor (PC) and Principal Designer (PD), fulfilling all Temporary Works requirements, including TWC and TWS roles and maintaining the Temporary Works Register.
The works comprise a temporary mock tunnel over Roads 58B & 58C and a temporary platform alongside Road 58B. Together, these will provide a realistic environment for operator training and for testing and commissioning the MPaC Delivery System (including Kirow cranes and tilting wagons) in preparation for the Aldgate Renewals / P&C Blockade.
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award 1 | Tone Scaffolding Services Limited | — | — |