Maintenance of Air Conditioning/Cooling Systems, Chilled Water Systems and Associated Plant Controls

Expired

Heriot-Watt University

Highlights

Deadline
4 Sept 2026
Estimated value
£160,000
Location
UKM75

Details

Published
5 Aug 2026
Deadline
4 Sept 2026
Value
£160,000
Location
UKM75
Source
Public Contracts Scotland
Source notice ID
rls-33-AUG561654
OCID
ocds-r6ebe6-0000839254
CPV codes
42510000, 50000000
View on Public Contracts Scotland

Description

The University is seeking to appoint a Contractor to provide a planned maintenance service to the installed air conditioning/cooling systems, chilled water systems and associated plant control and services at its main Edinburgh campus, the Jean Muir Student Village in Galashiels, which consists of three residential buildings, and the High Mill Building. Also included is Panmure House, situated in Edinburgh city centre.

Across these sites, the mechanical plant infrastructure includes a diverse mix of comfort heating and cooling systems as well as process‑cooling equipment. Assets include packaged chillers, VRV/VRF systems, split air‑conditioning units, close‑control units, and DX coil systems.

Similar opportunities

More from Heriot-Watt University

View all

Lots (1)

LotTitleValue
1The University is seeking to appoint a Contractor to provide a planned maintenance service to the installed air conditioning/cooling systems, chilled water systems and associated plant control and services at its main Edinburgh campus, the Jean Muir Student Village in Galashiels, which consists of three residential buildings, and the High Mill Building. Also included is Panmure House, situated in Edinburgh city centre. Across these sites, the mechanical plant infrastructure includes a diverse The University is seeking to appoint a Contractor to provide a planned maintenance service to the installed air conditioning/cooling systems, chilled water systems and associated plant control and services at its main Edinburgh campus, the Jean Muir Student Village in Galashiels, which consists of three residential buildings, and the High Mill Building. Also included is Panmure House, situated in Edinburgh city centre. Across these sites, the mechanical plant infrastructure includes a diverse mix of comfort heating and cooling systems as well as process‑cooling equipment. Assets include packaged chillers, VRV/VRF systems, split air‑conditioning units, close‑control units, and DX coil systems.. Economic operators may be excluded from this competition if they are in any of the situations referred to in regulation 58(1) of the Public Contracts (Scotland) Regulations 2015.