Market Engagement Questionnaire for T1418 How can batteries make the DC network safer and more cost effective?
PlanningHighlights
- Deadline
- —
- Estimated value
- £180,000
- Location
- —
Details
- Published
- 8 Jun 2026
- Deadline
- —
- Value
- £180,000
- Location
- —
- Source
- Find a Tender
- Source notice ID
- 053890-2026
- OCID
- ocds-h6vhtk-06b002
- CPV codes
- 73110000
Description
DC electrification is a system used to provide electric traction power to trains via an exposed conductor rail, commonly described as the ‘3rd rail’. The 3rd rail system is predominantly used in the south of England but is also used by the Merseyside commuter rail network in the North-West. Because of its accessible position on the ground next to the running rails, 3rd rail systems pose an electrical safety risk to the public and railway staff.
To address these concerns in a cost-effective way, small retrofittable batteries could be used to allow trains to run between modest gaps in 3rd rail. This would allow removal of live 3rd rail at higher risk location such as stations, level crossing, and junctions. Elimination of certain sections of the DC network, such as at switch and crossing junctions, could also result in maintenance productivity gains. RSSB project T1272 ‘Compatibility and optimisation considerations for rolling stock traction batteries and battery charging’ (T1272 Phase 1b Report FINAL – Page 64) indicated that a modest sized battery of 100 kWh could potentially remove larger parts of the DC network and allow a train to move through up to two kilometres of traction power disruptions.
The introduction of batteries for these aims must consider capital and operational costs, the engineering and operational controls that would be needed, and the transition strategy for both rolling stock and infrastructure.
For more information about this opportunity, please visit the eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-London:-Research-services./F3ZBDSMB6C
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/F3ZBDSMB6C
Similar opportunities
- Local Nature Recovery Strategies - harnessing geodiversity for nature recoveryTenderNatural EnglandCloses 16 Nov 2026
- ACE 1128 ITQ Youth Voice Sector Insight and EvidenceTenderThe Arts Council of EnglandCloses 30 Nov 2026
- Rewiring the State – accelerating the benefits of devolutionTenderLocal Government Association (LGA)Closes 1 Dec 2026
- Rewiring the State – principles for enabling the collaborative advantageTenderLocal Government Association (LGA)Closes 1 Dec 2026
- 2026-SUS-008 1083149035 People-centred Climate Impact AssessmentTenderRail Safety Standards Board (RSSB)Closes 10 Dec 2026
More from Rail Safety Standards Board (RSSB)
View all- 2026-SUS-008 1083149035 People-centred Climate Impact AssessmentTenderRail Safety Standards Board (RSSB)Closes 10 Dec 2026
- 1074032381 T1424 Passenger Rolling Stock Emergency Window Repair ProceduresTenderRail Safety Standards Board (RSSB)Closes 18 Nov 2026
- 1073434028 T1427 Strategy for Harmonising Automatic Current Limitation Across Electric Rolling Stock in GBTenderRail Safety Standards Board (RSSB)Closes 16 Nov 2026
- GB-London: 1047912512 2026-SUS-001 Consultancy Support for a Rail Industry Social Impact ReportAwardRail Safety Standards Board (RSSB)Awarded £28,250
- GB-London: 1030972047 25-005 - Review of the operational requirements for GSMR radio - Phase 2AwardRail Safety Standards Board (RSSB)Awarded £65,600
Lots (1)
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |