MEP Tender Notice
TenderHighlights
- Tender deadline
- 14 Oct 2026
- Estimated value
- £9,000,000
- Location
- UKI
Details
- Published
- 19 Aug 2026
- Tender deadline
- 14 Oct 2026
- Value
- £9,000,000
- Location
- UKI
- Source
- Find a Tender
- Source notice ID
- 079192-2026
- OCID
- ocds-h6vhtk-06e802
- CPV codes
- 45300000
Description
MEPH
- Survey, isolate, strip out and dispose of relevant existing services in a safe manner.
- Survey and report on condition of existing services in the Phase 1 areas that are being retained
- Enabling works and decommissioning of Phase 1 works
- CCTV Survey of existing drainage/rainwater stacks
- Above ground soil & waste drainage consisting of new pipework, thermal and acoustic insulation, chlorination and treatment
- Above ground rainwater drainage system consisting of new pipework, thermal and acoustic insulation, sump pump
- Supply and installation of sanitaryware including, but not limited to WCs, sinks, taps
- Domestic cold water services including mains supply, boosted distribution, storage tank, booster set, pumps, conditioner, trace heating, leak detection and insulation
- Water booster set located in the 'Strands vaults', provided as Part of Phase 1 is to be extended as part of Phase 2 works.
- Hot water plant and distribution pipework including insulation
- Low temperature hot water (LTHW) heating systems
- Dry riser system
- Water treatment, flushing & chlorination
- Specialist water treatment / humidification systems (RO plant)
- Pipework insulation & trace heating
- Chilled water systems
- Heat pump plant & associated infrastructure
- Underfloor heating systems
- Variable refrigerant flow (VRF) system including cooling units, controllers, refrigerant & condensate pipework distribution, FCUs and insulation
- Refrigerant leak detection
- Electric heating systems - radiant heaters and controls
- Gas installation to Kitchens
- Boiler flue
- Meters - heat interface, water and gas. All meters shall be connected and monitored from the Courtauld's automated metering system.
- Liaison with Thames Water
VENTILATION
- Air handling units and heat recovery units
- Toilet extract fans
- Attenuators including cross talk
- Fresh air intake ductwork
- Exhaust ductwork 6. Supply ductwork 7. Extract ductwork 8. Kitchen fire rated ductwork 9. Diffusers, grilles and flexible connections
- Motorised fire / smoke dampers
- Thermal Insulation
- Acoustic lining where required
- Ductwork cleaning
- General fire rated ductwork
- Volume control dampers
- Variable air volume (VAV) systems
- Smoke extract and smoke control systems
- Natural ventilation controls & actuated windows
- Air handling plant ancillary equipment
- Ceiling and wall fans within East wing & Library
ELECTRICAL
- Survey, isolate, strip out and dispose of relevant existing services in a safe manner.
- Survey and report on condition of existing services in the Phase 1 areas that are being retained
- Enabling works and decommissioning of Phase 1 works
- Liaison with UKPN for their works involving upgraded supply
- LV switchgear
- Distribution boards
- Sub-main cabling distribution
- Sub-metering
- Busbar systems
- Life safety LV cable distribution
- Life safety emergency lighting cable
- Primary and secondary containment
- Mechanical power supplies
- Power supplies for specialist systems
- Floor boxes
- Isolators
- Sockets
- General lighting systems
- Emergency lighting systems
- Lighting Control including cabling
- Transformer enclosures
- Hook up connection to be utilised for a generator to provide temporary power for changeover of UKPN supply
- Energy metering & monitoring
- Main equipotential bonding
- Earthing to lift shafts
- Surge protection
- Electromagnetic screening
- Automatic Transfer Switches (ATS) including mimic panels for evacuation lifts.
MEP COMMON
- Plant handling and movement
- Testing & commissioning
- Interfaces & overall systems integration
- Bracketry and secondary steelwork
- O&M manuals
- Labelling and identification
- Integrated and black building testing
- Integrated systems testing (IST)
- BREEAM requirements
- Surveys and validations
- Final clean
- Temporary protection
- Inertia bases
- Client training
- 12 month warranties
- Samples
- Soft landings
- Noise & vibration control
- Seasonal commissioning
- Fire protection pillows within containment
- Intumescent Putty Pads (supply and install) / Hockey Sticks (supply and free issue to Dryliner)
- Fire Stopping and Fire Collars to all penetrations of 50mm x 50mm or less through all walls or floors (including concrete).
- Existing services being retained
- Arrange lift & shift equipment
- BWIC up to 50mm
- Big foot system and hop overs
Similar opportunities
- BCU-ITT-64088 - NORTH WALES MEDICAL SCHOOL - CENTRAL (YGC)TenderBetsi Cadwaladr University Health BoardCloses 15 Oct 2026
- Liversedge and Settle RoofTenderYorkshire Housing LimitedCloses 18 Sept 2026
- Forest Infrastructure Construction & Maintenance Framework 2027TenderNatural Resources WalesCloses 21 Oct 2026
- Relocation of Thorne Moors Viewing TowerTenderNatural EnglandCloses 15 Oct 2026
- Capital Works and Associated Services Dynamic Purchasing SystemTenderProcurement for Housing Limited—
More from COURTAULD INSTITUTE OF ART
View all- Demolition & Structural AlterationsExpiredCOURTAULD INSTITUTE OF ARTClosed 27 Aug 2026
- Courtauld Strand Campus - Construction ManagementAwardCOURTAULD INSTITUTE OF ARTAwarded £5,299,048
Lots (1)
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | £9,000,000 |