NBI Energy Centre - CHP Engines - Next Generation Infrastructure Programme
AwardHighlights
- Award value
- £7,175,851
- Winning supplier
- 2G ENERGY LTD.
- Award date
- —
Details
- Published
- 24 Jun 2026
- Deadline
- —
- Value
- £7,175,851
- Location
- —
- Source
- Find a Tender
- Source notice ID
- 059570-2026
- OCID
- ocds-h6vhtk-06bc7e
- CPV codes
- —
Description
This package of works forms part of the Next Generation Infrastructure (NGI) Programme, a funded development programme looking to develop the facilities across Norwich Research Park to transform the existing capabilities of John Innes Centre (JIC) and The Sainsbury Laboratory (TSL), both internally recognised centres of excellence in plant and microbial science. NGI will address the deterioration of infrastructure at JIC and TSL to create a world-class facility that will engage with its surroundings, is outward looking and promotes collaboration and innovation to supercharge JIC and TSL's ability to translate scientific knowledge into practical solutions.
As part of the NGI Programme, JIC to looking to procure, on behalf of the Norwich Bioscience Institutes (NBI), the services of a specialist supplier for the proposed design, supply, installation and ongoing service provision associated with a Combined Heat and Power system (CHP Engines) within the new NBI Energy Centre located at JIC.
This is a two stage tendering process where:
(i) At Stage One: proposed procurement for the design of the CHP engines through a pre-construction services agreement; and
(ii) At Stage Two: proposed procurement for the supply, installation and ongoing service provision through a construction contract (JCT Design and Build 2024 with client amends) and a service agreement following completion of the design in Stage One.
More from JOHN INNES CENTRE
View all- Site Wide Infrastructure - Next Generation Infrastructure ProgrammeContractJOHN INNES CENTREAwarded
- 4-year service contract renewal for Carl Zeiss Gemini SEMContractJOHN INNES CENTREAwarded
- Leica SP8 confocal microscope 2-year service contractContractJOHN INNES CENTREAwarded
- 3-year service contract for 3 Gatan/Ametek itemsContractJOHN INNES CENTREAwarded
- Next Generation Infrastructure Programme - Project Manager SecondmentContractJOHN INNES CENTREAwarded
Lots (1)
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
Awarded contracts (3)
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Pre Construction Services Agreement | 2G ENERGY LTD. | £747,149 | — |
| Design and Build Construction Contract | 2G ENERGY LTD. | £3,075,102 | — |
| Services Agreement | 2G ENERGY LTD. | £3,353,600 | — |