Proposed Conservation Repairs at Leishman Centre Glencoe
ExpiredHighlights
- Deadline
- 7 Aug 2026
- Estimated value
- —
- Location
- UKM6
Details
- Published
- 10 Jul 2026
- Deadline
- 7 Aug 2026
- Value
- —
- Location
- UKM6
- Source
- Public Contracts Scotland
- Source notice ID
- rls-5-JUL559880
- OCID
- ocds-r6ebe6-0000837040
- CPV codes
- 45000000, 45212350, 45260000, 45262500, 45332000, 45421000, 45443000, 45453000, 45453100, 45454100
Description
Proposed Conservation Repairs at Leishman Centre Glencoe.
Similar opportunities
- BCU-ITT-64089 - North Wales Medical School - West (YG)TenderBetsi Cadwaladr University Health BoardCloses 19 Oct 2026
- BCU-ITT-64088 - NORTH WALES MEDICAL SCHOOL - CENTRAL (YGC)TenderBetsi Cadwaladr University Health BoardCloses 15 Oct 2026
- Liversedge and Settle RoofTenderYorkshire Housing LimitedCloses 18 Sept 2026
- Forest Infrastructure Construction & Maintenance Framework 2027TenderNatural Resources WalesCloses 21 Oct 2026
- Relocation of Thorne Moors Viewing TowerTenderNatural EnglandCloses 15 Oct 2026
More from National Trust for Scotland
View all- Mackintosh Illuminated - Standing Building SurveyExpiredNational Trust for ScotlandClosed 7 Sept 2026
- Project ManagementExpiredNational Trust for ScotlandClosed 6 Jul 2026
- Hill of Tarvit Mansion & Garden, Steel Fire Escape Stairs & Stone Wall RepairsExpiredNational Trust for ScotlandClosed 7 Jul 2026
Lots (1)
| Lot | Title | Value |
|---|---|---|
| 1 | Repointing and limewashing of all masonry wall surfaces. New lead ridging, slate repairs, SVP re-detailing, and replacement of existing Rooflights with conservation style rooflights. Resizing of, renewal of, and provisional of additional rainwater goods. Renewal of majority external window and doors units with associated internal Fabric reinstatements. Formation of new first floor access steps, removal of redundant services and entry points. Repositioning of deer larder cooler unitRepointing and limewashing of all masonry wall surfaces. New lead ridging, slate repairs, SVP re-detailing, and replacement of existing Rooflights with conservation style rooflights. Resizing of, renewal of, and provisional of additional rainwater goods. Renewal of majority external window and doors units with associated internal Fabric reinstatements. Formation of new first floor access steps, removal of redundant services and entry points. Repositioning of deer larder cooler unit Installation of replacement vent grills through external masonry Renewal of retaining wall copes in stone Renewal of external light fittings and other external repairs and refinements. Installation of new ground and rainwater drainage systems. | — |