PS/26/120 - Sheet Pile Wall Works at Kirkford Gabions, Stewarton

Award

East Ayrshire Council

Highlights

Award value
£698,640
Winning supplier
Track Civil Enginineering Solutions Ltd
Award date
7 Sept 2026

Details

Published
8 Sept 2026
Deadline
Value
£698,640
Location
UKM93
Source
Public Contracts Scotland
Source notice ID
rls-2-SEP563995
OCID
ocds-r6ebe6-0000837679
CPV codes
44212410, 45111230, 45233142, 45233220
View on Public Contracts Scotland

Description

An existing gabion wall, retaining a slope and footpath above, within Annick Water is in a deteriorated state. If no remediate works in the form of scour protection are undertaken, this may lead to a slope stability issue of the greater slope.

Ayrshire Roads Alliance (East Ayrshire Council), wish to prevent any further deterioration of this structure and prevent any slope stability issues from as a result of the failing wall. Thus interventional remediation measures are required to protect the bank and slope toe form further erosion.

Similar opportunities

More from East Ayrshire Council

View all

Lots (1)

LotTitleValue
1The purpose of the works is to undertake the following main elements: - Undertake enabling works to create temporary access to allow creating of dry working area and working platform within Annick Water - Install 55ln m of sheet pile wall along the front face of an existing gabion wall - Backfill behind the sheet pile wall with low cement/low embodied carbon concrete to fill void - Regrade slope above sheet pile wall to max gradient of 1:2 using imported 6G (100-200mm) stone and add topsThe purpose of the works is to undertake the following main elements: - Undertake enabling works to create temporary access to allow creating of dry working area and working platform within Annick Water - Install 55ln m of sheet pile wall along the front face of an existing gabion wall - Backfill behind the sheet pile wall with low cement/low embodied carbon concrete to fill void - Regrade slope above sheet pile wall to max gradient of 1:2 using imported 6G (100-200mm) stone and add topsoil dressing - Locally reinstate/repair riverbank bund using rock armour (HMA 300/1000).

Awarded contracts (1)

TitleSupplierValueAwarded
Award ocds-r6ebe6-0000837679-1Track Civil Enginineering Solutions Ltd£698,6407 Sept 2026