PURCON 2227 - Sainsbury Centre Refurbishment
PlanningHighlights
- Deadline
- —
- Estimated value
- £76,000,000
- Location
- UKH15
Details
- Published
- 5 Aug 2026
- Deadline
- —
- Value
- £76,000,000
- Location
- UKH15
- Source
- Find a Tender
- Source notice ID
- 074402-2026
- OCID
- ocds-h6vhtk-06dcec
- CPV codes
- 45212313
Description
The University of East Anglia (UEA) is an internationally renowned university based in a campus that provides top quality academic, social and cultural facilities to over 17,000 students and 2,500 staff.
The University of East Anglia (UEA) has been ranked in the top 20 in the UK for its research quality, in the Complete University Guide's UK top 30 and has achieved the green flag award for 9 years running.
The Sainsbury Centre, positioned on the western side of the University of East Anglia Campus is a world-class museum designed by Norman Foster (now Foster + Partners) and opened in 1978. The building integrates a number of related activities within a single, light-filled space. Structural and service elements are contained within the double-layer walls and roof. Within this shell is a sequence of spaces that incorporates galleries, a reception area, research and education spaces, offices, library, café, shop and restaurant.
Over the years, the building has undergone a number of improvements, refurbishments and extensions, including the addition of the Crescent Wing in 1991 and the Link Project in 2006, which connected the Crescent Wing to the main building and the main building to the Lasdun Wall. These interventions have enabled the building to respond to changing operational and visitor requirements while maintaining its distinctive architectural character.
In 2012, the Sainsbury Centre was awarded Grade II* listed status in recognition of its exceptional architectural and historic significance. Its designation rests on several grounds: architectural innovation, as a defining late-twentieth century work by one of Britain's foremost modern architects, showcasing his signature engineering-led, prefabricated approach; celebrated design, reflecting its international standing as one of the best-known modern museum and education buildings; and historic association, as a purpose-built home for the globally significant Sainsbury Collection.
This project involves seeking a principal contractor to co-ordinate the replacement of the external envelope and extensive works to the building's MEP systems to ensure the following key objectives are met:
- Address multiple building-condition issues
- Improve energy efficiency.
- Improve visitor comfort and experience.
- Minimise long term maintenance liabilities.
Similar opportunities
- Airport Route UpgradesTenderTyne and Wear Passenger Transport Executive T/A NexusCloses 4 Sept 2026
- Sewer Flooding Mitigation FrameworkTenderUnited Utilities Water LimitedCloses 28 Sept 2026
- Characters of Fashion Exhibition (Build)TenderThe Mayor and Commonalty and Citizens of the City of LondonCloses 22 Sept 2026
- DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning OperationsTenderAltrad AtkinsRealis Joint Venture (A2R JV)Closes 17 Sept 2026
- Stansfield Road SuDS Project, Construction partnerTenderLondon Borough of HounslowCloses 1 Oct 2026
More from UNIVERSITY OF EAST ANGLIA
View all- Coach and Minibus FrameworkContractUNIVERSITY OF EAST ANGLIAAwarded
- FirstBus Recruitment Events Bus TicketsContractUNIVERSITY OF EAST ANGLIAAwarded
- Occupational Health ServicesContractUNIVERSITY OF EAST ANGLIAAwarded
- Flow CytometerAwardUNIVERSITY OF EAST ANGLIAAwarded £256,223
- Promotional MerchandiseAwardUNIVERSITY OF EAST ANGLIAAwarded £600,000
Lots (1)
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |