The proposed works comprise the refurbishment and enhancement of the existing Shirley Ponds Skatepark through extensive groundworks, site regrading and reinforced concrete construction. A key feature of the scheme is the retention of the existing skate ramps and trick features, which will remain in situ and be utilised as permanent formwork for the new concrete skatepark. Rather than demolishing and removing the existing structures, reinforced concrete will be poured over and around them, encapsulating the current features and incorporating them into the structural fabric of the new facility. This innovative approach removes the need for demolition and disposal of the existing equipment, reducing both construction costs and environmental impact whilst retaining much of the existing skatepark footprint. The works also include excavation and levelling of the site, installation of geotextile membrane, imported fill and Type 1 sub-base materials, reinforced concrete slabs, edge details and associated concrete riding surfaces. Together, these works will deliver a durable, modern concrete skatepark that maximises the value of existing assets while providing a significantly improved facility for users.