Supply of Temporary Trackway
AwardHighlights
- Award value
- —
- Winning supplier
- —
- Award date
- —
Details
- Published
- 1 Sept 2026
- Deadline
- —
- Value
- —
- Location
- UK
- Source
- Find a Tender
- Source notice ID
- 082615-2026
- OCID
- ocds-h6vhtk-04e476
- CPV codes
- 44100000
Description
OHL major refurbishment works carried out at approx. 90km circuits lengths per year, which means a requirement for ground stabilization is required for the purpose of ensuring appropriate load bearing can be placed for heavy plant and equipment as well as reducing our impact on land damage and erosion.
The Hirer requires the use of aluminium and plastic temporary roadway to gain access to various sites within the Southern Electric Power Distribution (SEPD) area (and potentially other network areas). The Hirer intends to use the roadways to move vehicles, mobile plant and various lifting equipment to its more remote sites, to which there is no suitable heavy-duty access, all with the purpose of constructing, demolishing, maintaining or refurbishing the Hirer’s network assets.
Similar opportunities
- 2026 WS3282950901 Maintenance, Repairs and Operations Goods (MRO) (Interim)TenderAnglian Water ServicesCloses 14 Oct 2026
- Green Roof Bike Stores RfQTenderCambridge City CouncilCloses 7 Oct 2026
- Green Roof Bike Stores RfQTenderCambridge City CouncilCloses 7 Oct 2026
- Sunny Corner Window and Door ReplacementTenderDover District CouncilCloses 14 Oct 2026
- Supply, Fit, Repairs and Maintenance of Fire doorsTenderWest Lancashire Borough Council—
More from SSE plc
View all- CO Supply & Install - Modular Substation Order - Achany - 0331AwardSSE plcAwarded
- CO Supply & Install - Modular Substation Order - Chleansaid 0331AwardSSE plcAwarded
- Modular SubstationAwardSSE plcAwarded
- SGT EquipmentAwardSSE plcAwarded
- CO Construction ECI GIS Substation Works – LT490/491/436 Stannergate Substation - 1126AwardSSE plcAwarded
Lots (1)
| Lot | Title | Value |
|---|---|---|
| 1 | OHL major refurbishment works carried out at approx. 90km circuits lengths per year, which means a requirement for ground stabilization is required for the purpose of ensuring appropriate load bearing can be placed for heavy plant and equipment as well as reducing our impact on land damage and erosion. The Hirer requires the use of aluminium and plastic temporary roadway to gain access to various sites within the Southern Electric Power Distribution (SEPD) area (and potentially other network areOHL major refurbishment works carried out at approx. 90km circuits lengths per year, which means a requirement for ground stabilization is required for the purpose of ensuring appropriate load bearing can be placed for heavy plant and equipment as well as reducing our impact on land damage and erosion. The Hirer requires the use of aluminium and plastic temporary roadway to gain access to various sites within the Southern Electric Power Distribution (SEPD) area (and potentially other network areas). The Hirer intends to use the roadways to move vehicles, mobile plant and various lifting equipment to its more remote sites, to which there is no suitable heavy-duty access, all with the purpose of constructing, demolishing, maintaining or refurbishing the Hirer’s network assets. | — |
Awarded contracts (1)
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| FW - Supply of Temporary Trackway - Grassform - Multi Site | — | — | — |