The Supply, Installation and Maintenance of EV Charging Infrastructure
ExpiredHighlights
- Deadline
- 7 Sept 2026
- Estimated value
- £12,000,000
- Location
- UKM
Details
- Published
- 6 Aug 2026
- Deadline
- 7 Sept 2026
- Value
- £12,000,000
- Location
- UKM
- Source
- Find a Tender
- Source notice ID
- 074824-2026
- OCID
- ocds-h6vhtk-06de01
- CPV codes
- 31610000, 34144900, 45223300, 45310000, 51100000
Description
Scottish Water is committed to supporting the transition to a low-carbon fleet and continues to expand its electric vehicle (EV) charging infrastructure across its estate throughout Scotland.<br/><br/>To support this objective, Scottish Water intends to appoint a single Contractor to provide a comprehensive end-to-end service for the supply, installation, commissioning, maintenance and repair of electric vehicle charging infrastructure throughout Scotland.<br/><br/>The appointed Contractor will be expected to work collaboratively with Scottish Water to support the ongoing development of its EV charging network, ensuring infrastructure is delivered safely, efficiently and in accordance with all relevant industry standards and legislation.<br/><br/>Further information can be found within section II.2.4) Description of the procurement of this advert.<br/><br/>Full scope information found within the PQQ documentation on the Scottish Water Atamis Portal. Please see link for the portal linked within this advert.
Similar opportunities
- Stoke Road, HenladeTenderStonewater LimitedCloses 16 Dec 2026
- TENDER FOR CAPITAL YOUTH PROGRAMME (ENNISKILLEN ROUND O) - 2627 CP 067NTenderFermanagh and Omagh District CouncilCloses 25 Nov 2026
- Kitchen Replacement ProgrammeTenderVICO HOMES LIMITEDCloses 18 Dec 2026
- Design, Supply, Installation and Commissioning of a Roof-Mounted Solar Photovoltaic (PV) System at The Enterprise Centre, FarnhamTenderWaverley Borough CouncilCloses 30 Nov 2026
- Property Refurbishment, Construction and MaintenanceTenderNATIONAL GRID UK LIMITED—
More from Scottish Water
View all- Supply of Lifting ChainsTenderScottish WaterCloses 1 Dec 2026
- The Supply and Delivery of Chlorine GasTenderScottish WaterCloses 27 Nov 2026
- The Supply of PE Pipes and FittingsTenderScottish WaterCloses 14 Nov 2026
- Bioresource TreatmentPipelineScottish WaterClosed 28 Oct 2026
- Provision of Motor Control Centres, Systems Integration and ICA ServicesTenderScottish WaterCloses 9 Nov 2026
Lots (1)
| Lot | Title | Value |
|---|---|---|
| 1 | Scottish Water is committed to supporting the transition to a low-carbon fleet and continues to expand its electric vehicle (EV) charging infrastructure across its estate throughout Scotland.<br/><br/>To support this objective, Scottish Water intends to appoint a single Contractor to provide a comprehensive end-to-end service for the supply, installation, commissioning, maintenance and repair of electric vehicle charging infrastructure throughout Scotland.<br/><br/>The appointed Contractor will Scottish Water is committed to supporting the transition to a low-carbon fleet and continues to expand its electric vehicle (EV) charging infrastructure across its estate throughout Scotland.<br/><br/>To support this objective, Scottish Water intends to appoint a single Contractor to provide a comprehensive end-to-end service for the supply, installation, commissioning, maintenance and repair of electric vehicle charging infrastructure throughout Scotland.<br/><br/>The appointed Contractor will be expected to work collaboratively with Scottish Water to support the ongoing development of its EV charging network, ensuring infrastructure is delivered safely, efficiently and in accordance with all relevant industry standards and legislation.<br/><br/>The successful Contractor shall provide a fully managed service for the delivery of EV charging infrastructure, including but not limited to:<br/>• Supply of AC and DC electric vehicle charging equipment<br/>• Site surveys, design and feasibility assessments where required<br/>• Civil engineering and electrical installation works<br/>• Installation and commissioning of EV charging equipment<br/>• Associated electrical infrastructure and enabling works<br/>• Testing and certification of completed installations<br/>• Planned preventative maintenance<br/>• Reactive maintenance and repair services<br/>• Equipment replacement and lifecycle support<br/>• Technical support and fault resolution services<br/>• Asset reporting and performance monitoring<br/><br/>The contract will support installations at Scottish Water operational sites and facilities throughout Scotland and may include depot locations, offices, treatment works and other operational premises.<br/><br/>Scottish Water intends to appoint a single Contractor to manage and deliver the full scope of services.<br/><br/>The Contractor shall act as the principal point of contact and be responsible for managing all activities associated with the provision of EV charging infrastructure and related services.<br/><br/>The Contractor shall demonstrate the capability and capacity to deliver services on a Pan-Scotland basis, including remote and rural locations where required.<br/><br/>The Contractor must demonstrate the capability to undertake the role of Principal Contractor and Principal Designer where required under the Construction (Design and Management) Regulations (CDM).<br/><br/>As a minimum requirement, the appointed Contractor must demonstrate compliance with the following:<br/>• IET Wiring Regulations (BS 7671) – Current Edition (18th Edition)<br/>• Relevant EV charging installation standards and guidance<br/>• Member of electrical trade body – SELECT (or equivalent) <br/>• Electricity at Work Regulations<br/>• Health and Safety at Work Act requirements<br/>• All applicable Scottish Water standards, policies and procedures<br/><br/>Full scope information and further information can be found within the PQQ documentation located within the Scottish Water Atamis portal. Please see link for the portal linked within this advert. Additional information: The procurement documents and questionnaires can be accessed by logging in through the Scottish Water Atamis e-sourcing portal - https://atamis-scottishwater.my.salesforce-sites.com/ProSpend__CS_PublicLandingPage?SearchType=Projects and ‘Registering Interest’ on the The Supply, Installation and Maintenance of EV Charging Infrastructure advert. | £12,000,000 |