Tunnel Segment Production Monitoring System copy
ExpiredHighlights
- Deadline
- 21 Aug 2026
- Estimated value
- £500,000
- Location
- London
Details
- Published
- 17 Aug 2026
- Deadline
- 21 Aug 2026
- Value
- £500,000
- Location
- London
- Source
- Contracts Finder
- Source notice ID
- 8487f9cc-06bc-476d-9212-9dfd09693e47-911042
- OCID
- ocds-b5fd17-e86010e9-31cb-4390-97d2-24719474ed92
- CPV codes
- 45221247
Description
This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration.
This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.
Similar opportunities
- BCU-ITT-64089 - North Wales Medical School - West (YG)TenderBetsi Cadwaladr University Health BoardCloses 19 Oct 2026
- BCU-ITT-64088 - NORTH WALES MEDICAL SCHOOL - CENTRAL (YGC)TenderBetsi Cadwaladr University Health BoardCloses 15 Oct 2026
- Liversedge and Settle RoofTenderYorkshire Housing LimitedCloses 18 Sept 2026
- Forest Infrastructure Construction & Maintenance Framework 2027TenderNatural Resources WalesCloses 21 Oct 2026
- Relocation of Thorne Moors Viewing TowerTenderNatural EnglandCloses 15 Oct 2026
More from Sizewell C Limited
View all- Tunnel Segment Production Monitoring SystemExpiredSizewell C LimitedClosed 14 Aug 2026
- Site Power HV/LV Electrical DesignExpiredSizewell C LimitedClosed 18 Aug 2026
- Tunnel Segment Production Monitoring SystemExpiredSizewell C LimitedClosed 14 Aug 2026